SUEZ ENVIRONNEMENT wins a 4-year, 65 million contract to operate and maintain the residual water collection system in Panama City

Posted: Friday 9th January 2015

Degrémont, a SUEZ ENVIRONNEMENT subsidiary, has been chosen by the Panama Ministry of Health (MINSA) to maintain and operate the wastewater collection systems, pumping stations and other networks in Panama City over a period of four years.

This 65 million contract covers the operation and maintenance of a 162 km system of pipes that is due to be extended to 248 km in 2016. The contract includes the repair of certain infrastructures and the supply of equipment.




Read the magazine online

May 2019

About the magazine »
Magazine archive »


Advertisements

Information for advertisers »

Xylem
Huber Prominent Fluid Controls British Water Verder buttonwood marketing Water Aid Harvey Communications Pulsar Button June 13 wateractive
Grundfos 2018