Articles & Case Studies

Zaun opens gates to Thames Water

Posted: Monday 23rd November 2015

Perimeter fencing expert Zaun has installed trackless bi-folding automatic speed gates at a Thames Water administration building.

The vehicle gates which incorporate live-monitored safety edges, dual height safety photocells and manual-disengaging vertical infill bars have replaced old rising arm barriers at Kemble Court, Thames Water's Operations Management Centre in Reading.

Zaun also installed an adjacent pedestrian turnstile with a passage for bicycles and integrated the installation into existing fencing with 1.8m high HiSec fencing.

So pleased are Thames Water with the vehicle gate solution that they have specified it for one of their many sewage treatment plants, at East Hyde in Luton, that operates a combined heat and power (CHP) unit to generate the electricity the plant needs.

The CHP process 'brews and chews' sewage sludge to break down biodegradable material creating biomethane, or biogas, while methane from the sludge is burned to create heat, which in turn generates renewable electricity using a pre-treatment process called thermal hydrolysis.




Read the magazine online

April 2019

About the magazine »
Magazine archive »


Advertisements

Information for advertisers »

Grundfos 2018
Water Aid Prominent Fluid Controls buttonwood marketing Pulsar Button June 13 Harvey Communications Huber Verder British Water wateractive
Sykes Pumps