The issue

When Thames Water needed to replace an old gearbox on a picket fence thickener sludge tank at its White Walham sewage treatment works in Slough it called on Brammer to provide a highly efficient solution.

The old double reduction worm gearbox had a single v-belt running from the motor to the gearbox and was proving to be very inefficient – running at just 60% capacity. The V-belt was also being used as a torque limiter on the unit meaning that if the tank paddle jammed, the belt would slip and shred requiring time-intensive mechanical work.

As the unit is now obsolete and spares are no longer available to initiate a repair, Brammer recommended that it was in Thames Water’s best interest to replace the old gearbox with a new modern unit rather than attempt an overhaul.

The solution

Taking lifetime costs into account Brammer identified, in conjunction with Brevini Gearboxes, a standard planetary gearbox with an incorporated torque limiter as the ideal solution.

Managing the process to install the new unit, the team at Brammer had to drain the tank and erect scaffolding inside to allow the old gearbox to be unbolted and uncoupled from underneath.

Bringing all the elements together, Brammer called on a local engineering firm to manufacture a bespoke ball housing to bolt in between the gearbox and the sludge tank. The housing encases a Renold pin coupling and SKF thrust bearing and stub shaft to hold the weight of the sludge tank paddle.

The result

The new gearbox is modern and highly efficient – increasing efficiency to 95%. The integral torque limiter now means that if the tank paddle jams the torque limiter will trip and will simply need resetting – providing time and cost savings for Thames Water as this negates the need for mechanical repairs.

The Brevini planetary gearbox can also be removed in the future without the need to drain the tank and pay for scaffolding inside.

Mitch Chambers of Brammer who was involved in the project, said: “The installation of the Brevini gearbox will extend product life, reduce the need for costly maintenance and provide real energy efficiency savings for Thames Water. We have also taken the opportunity to standardise all parts used which will reduce working capital in the long term.”

Simon Brades, M&E Engineer for Thames Water said: “Brammer brought everything together on this project to source what is proving to be a highly effective solution to the troublesome old gearbox.”




Read the magazine online

December 2018

About the magazine »
Magazine archive »


Advertisements

Information for advertisers »

Sykes Pumps
British Water Prominent Fluid Controls buttonwood marketing Pulsar Button June 13 Harvey Communications Verder Huber Water Aid wateractive
ATI UK